{"id":84362,"date":"2026-06-22T14:16:15","date_gmt":"2026-06-22T12:16:15","guid":{"rendered":"https:\/\/tetas.lt\/tetas-reconstructs-berciunai-transformer-substation-in-panevezys-district\/"},"modified":"2026-06-22T14:20:48","modified_gmt":"2026-06-22T12:20:48","slug":"tetas-reconstructs-berciunai-transformer-substation-in-panevezys-district","status":"publish","type":"post","link":"https:\/\/tetas.lt\/en\/blog\/2026\/06\/22\/tetas-reconstructs-berciunai-transformer-substation-in-panevezys-district\/","title":{"rendered":"Tetas Reconstructs Ber\u010di\u016bnai Transformer Substation in Panev\u0117\u017eys District"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Tetas has successfully completed the contracted reconstruction works at the Ber\u010di\u016bnai transformer substation. The project was carried out on behalf of Litgrid at the substation located in Papu\u0161iai village, Panev\u0117\u017eys Eldership, Panev\u0117\u017eys District Municipality. The value of the project amounted to EUR 2.8 million.   <\/strong><\/p>\n\n<p class=\"wp-block-paragraph\">During the reconstruction, the 110 kV switchyard was upgraded, the transformer substation configuration was modified, and modern control and communication solutions were installed. The main 110 kV equipment and its supporting structures were also replaced, while remote-control capabilities were expanded, enabling more efficient and responsive management of the electricity transmission network. <\/p>\n\n<p class=\"wp-block-paragraph\">\u201cBy modernising transformer substations, we are consistently strengthening the resilience and flexibility of the entire electricity transmission system. The reconstruction of the Ber\u010di\u016bnai substation will enable more reliable management of electricity flows in northern Lithuania, faster response to changes in the grid, and a high quality of electricity supply for consumers,\u201d says Adomas Birulis, Head of the Substation Projects Unit at Litgrid\u2019s Strategic Infrastructure Department. <\/p>\n\n<p class=\"wp-block-paragraph\">\u201cProjects such as the reconstruction of the Ber\u010di\u016bnai transformer substation allow us to apply Tetas\u2019 long-standing experience in implementing energy infrastructure modernisation works. The upgraded substation will contribute to the more reliable operation and more efficient management of the electricity transmission network, while for us it represents another important contribution to strengthening the country\u2019s energy infrastructure,\u201d says Dovydas Gru\u0161auskas, Project Manager at Tetas\u2019 Project Management Division. <\/p>\n\n<p class=\"wp-block-paragraph\">The project also included the application of more environmentally friendly technological solutions. Modern equipment was used to reduce environmental impact and contribute to the development of a more sustainable electricity transmission infrastructure.<\/p>\n\n<p class=\"wp-block-paragraph\">The upgraded Ber\u010di\u016bnai transformer substation will strengthen the reliability of the regional electricity network, create conditions for more efficient management of electricity flows, and contribute to improving the quality of electricity transmission for consumers in northern Lithuania.<\/p>\n\n<p class=\"wp-block-paragraph\">This project represents another contribution by the Tetas team to a more reliable, modern and sustainable energy infrastructure in Lithuania.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Tetas has successfully completed the contracted reconstruction works at the Ber\u010di\u016bnai transformer substation. The project was carried out on behalf of Litgrid at the substation located in Papu\u0161iai village, Panev\u0117\u017eys Eldership, Panev\u0117\u017eys District Municipality. The value of the project amounted to EUR 2.8 million. During the reconstruction, the 110 kV switchyard was upgraded, the transformer [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":84361,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"iawp_total_views":0,"footnotes":""},"categories":[66],"tags":[],"class_list":["post-84362","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-2026"],"_links":{"self":[{"href":"https:\/\/tetas.lt\/en\/wp-json\/wp\/v2\/posts\/84362","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tetas.lt\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tetas.lt\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tetas.lt\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/tetas.lt\/en\/wp-json\/wp\/v2\/comments?post=84362"}],"version-history":[{"count":1,"href":"https:\/\/tetas.lt\/en\/wp-json\/wp\/v2\/posts\/84362\/revisions"}],"predecessor-version":[{"id":84363,"href":"https:\/\/tetas.lt\/en\/wp-json\/wp\/v2\/posts\/84362\/revisions\/84363"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tetas.lt\/en\/wp-json\/wp\/v2\/media\/84361"}],"wp:attachment":[{"href":"https:\/\/tetas.lt\/en\/wp-json\/wp\/v2\/media?parent=84362"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tetas.lt\/en\/wp-json\/wp\/v2\/categories?post=84362"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tetas.lt\/en\/wp-json\/wp\/v2\/tags?post=84362"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}