Projects

Metrological verification and wind turbine testing services for 330 kV voltage measurement transformers

Verbund Hydro Power 85 MVA new transformer installation in Kaprun, Austria

Varduva 110 kV switchyard reconstruction works

Installation of new modular transformers and connection of a 4.4 MW solar park to the distribution grid

Reconstruction of the 110/10 kV Ąžuolynės TP 110 kV switchyard, separation of the 110 kV OL Neris-Šeškinė II into OL Neris-Ąžuolynė and OL Ąžuolynė-Šeškinė, construction of a new 110 kV OL pylon (design and construction works)

Design and construction works for 330/110/10 kV Jurbarkas transformer substation capacity increase (transport and installation of autotransformers)